top of page

14. BTTB Introductory Method Statement Activity

Writer: Peter Roberts
Peter Roberts
May 29, 2023
1 min read

Download this resource from the link towards the bottom of the page


20 short printed statements listing the sequence of work operations to construct a simple cavity wall with short return. Print off, cut (ideally laminate) and shuffle before issuing to your students who will be required to place them in the correct order.


Suitable for level 1 students, either an individual completing this as a revision exercise or for small groups with who you wish to work collaboratively.


Presented on PowerPoint slides for easy checking. When printing, remember to print on one side only. Best laminated for longevity.


THIS IS ALSO AVAILABLE AS A DRAG AND DROP ACTIVITY

BTTB.png

Sign up to Receive
News & Information

Thanks for submitting!​

© 2022 by BTTB Proudly created by SRPM

© Permission granted to reproduce all content for personal and educational use only. Commercial copying, hiring, lending is prohibited.

Contact us directly via email

bottom of page