top of page
RESOURCE LIBRARY
All BTTB resources are free to access.


The Ryan Lewis Cricket Fifty - Two Team - Year 1 Themes (desktop)
Not suitable for a mobile Red Ball team v White Ball team. 25 balls each, 5 wickets for each team. 5 Themed values: 1 run = tools. 2 runs = brick/block terms and measurements, 3 runs = information sources, 4 runs = health and safety acronyms, 6 runs = construction calculations Take it in turns to bowl. Red team first.


BTTB Cricket The Fifty (desktop version series B)
Not suitable for a mobile. SERIES B . Suitable for bricklaying learners closing in on their end assessments at Level 2. This game contains 120 questions that will be randomly attached to a ball when 'BOWL BALL' is pressed. A different game every innings. PRESS BOWL BALL TO START


BTTB Cricket The Fifty (desktop version series A)
Not suitable for a mobile. SERIES A . Suitable for bricklaying learners closing in on their end assessments at Level 2. This game contains 120 questions that will be randomly attached to a ball when 'BOWL BALL' is pressed. A different game every innings. PRESS BOWL BALL TO START


BTTB Cross the Grid Construction Quiz
Download this resource from the link below An in session revision quiz, requiring two teams to answer alternate questions and try to cross the board joining up with the opposite colour tiles, one teaming working horizontally and the other team working vertically. 20 tiles containing questions that can be selected in any order, that you can change colour when answered correctly, additional questions posed if answered incorrectly.


L3 Craft Bricklayer Interview Practice Questions asked by Jack
Press select question to start the activity. Questions selected randomly. Ideally a group activity, led by the tutor/assessor so that quality of responses provided can be reviewed and discussed.


L3 Craft Bricklayer Interview Practice Questions asked by Peter
Press select question to start the activity. Questions selected randomly. Ideally a group activity, led by the tutor/assessor so that quality of responses provided can be reviewed and discussed.


Bricklayer L2 V1.2 Interview Practice Questions asked by Peter
Press select question to start the activity. Questions selected randomly. Ideally a group activity, led by the tutor/assessor so that quality of responses provided can be reviewed and discussed.


Bricklayer L2 V1.2 Interview Practice Questions asked by Ryan
Press select question to start the activity. Questions selected randomly. Ideally a group activity, led by the tutor/assessor so that quality of responses provided can be reviewed and discussed. Thank you to Ryan Lewis for his collaboration.


Bricklayer L2 V1.2 Interview Practice. Questions asked by Kevin
Press select question to start the activity. Questions selected randomly. Ideally a group activity, led by the tutor/assessor so that quality of responses provided can be reviewed and discussed. Thank you to Kev Davison from OTE Construction Training for his collaboration.


Information Sources Odd One Out
30 sets of 3 text / image options, One of the three options is the odd one out, you need to identify and select it. You only have 90 seconds so push on


BTTB 20 Construction Calculations Multiple Choice Quiz
20 construction questions in a random order, you have 30 seconds to complete each question, so work at pace and stay focused.


BTTB Round the Clock Dartboard Maths Quiz (Desktop)
Desktop Version Can you turn the board green? 20 calculation questions, with a maximum score of 210. Game will progress automatically after you submit each question response.


BTTB Vertical Measurement Readings
15 vertical measurement staff readings to identify. You have 20 seconds to look at each reading and enter the measurement in the relevant boxes Note: Metres and Millimetres are entered separately There is a tolerance of 1mm for a correct entry. Green = correct, Red = incorrect.


BTTB Construction Calculation Tools
Select any of the BTTB construction calculation tools by clicking on the title block in the menu below. You will be able to return to this page by following the BTTB Calculation Tool Menu link at the top of each app.


Concrete Volume Calculator (circular on plan)
For circular on plan slabs, patios, columns and pile foundations. Insert radius and height measurements to calculate volumes of concrete, with the additional function of including up to 6 separate sets of measurements (select Add Another Set of Measurements). Click here to return to BTTB Calculation Tool Menu


Concrete Volume Calculator
For rectangular and square slabs, paths, patios and raft, strip, pad foundations. Insert Length Width, Depth measurements to calculate volumes of concrete, with the additional function of including up to 6 separate sets of concrete measurements (select Add Another Set of Measurements). Click here to return to BTTB Calculation Tool Menu
bottom of page
